Monday, March 21, 2011

Blade Drive and removal of the 50M model.

Disassemble and rebuild the model 50M. Place the tool in a vise padded. Using pliers, align the split pin on the side of the pin roller bearing # 5. Remove the cotter pin out of touch. Save the pin is reinstalled.

Friends Link : Here is the ozone-free ionizer with active purific find more save about blower